Kitchen and bathroom renovation

Selective demolition, plumbing and wiring brought up to code, tiling and cabinet installation.

Duration:
Usually 3 to 6 weeks, depending on the project
Ideal for:
Kitchens and bathrooms that need more than a coat of paint, homeowners who want one schedule and one contact.
Kitchen and bathroom renovation
Service overview

Redoing a kitchen or a bathroom takes planning down to the millimetre. Our process covers the safe demolition of the old structures, the reconfiguration of the plumbing and electrical systems and bringing them up to code, surface preparation (walls and floor underlayment), tiling, and the careful installation of cabinets, countertops and fixtures. We schedule the work to keep the disruption and the dust down. Our turnkey quote includes every trade involved, from demolition to the final finish.

What is included
Safe demolition

Controlled removal of the old structures before the room is reconfigured.

Plumbing and wiring to code

Systems reconfigured and brought up to code before the walls close.

Careful installation

Surface preparation, tiling, cabinets, countertops and fixtures.

Turnkey quote

Every trade included, from demolition to the final finish.

You may also be interested in

Our other services.