A floor lasts because of how it was laid and what was done to the base underneath. Our carpenters start by removing and responsibly disposing of your old floor, then inspect and fully level the subfloor (plywood or concrete slab) to take out the imperfections and the squeaks. The installation itself follows the material: nailed hardwood, floating, or glued down. We finish by fitting the baseboards, quarter-round and transition strips precisely.
Inspected and fully levelled to take out imperfections and squeaks.
Nailed hardwood, floating or glued down, according to the material.
Baseboards, quarter-round and transition strips fitted to the millimetre.
Removal and responsible disposal of your old covering, included in the quote.