Floor covering installation

Old covering removed, subfloor levelled, technical installation and trim fitted.

Duration:
Usually 2 to 5 days, depending on the area
Ideal for:
Any room where the floor is worn, cold or wrong for the moisture level.
Floor covering installation
Service overview

A floor lasts because of how it was laid and what was done to the base underneath. Our carpenters start by removing and responsibly disposing of your old floor, then inspect and fully level the subfloor (plywood or concrete slab) to take out the imperfections and the squeaks. The installation itself follows the material: nailed hardwood, floating, or glued down. We finish by fitting the baseboards, quarter-round and transition strips precisely.

What is included
Subfloor prepared

Inspected and fully levelled to take out imperfections and squeaks.

Technical installation

Nailed hardwood, floating or glued down, according to the material.

Precise trim work

Baseboards, quarter-round and transition strips fitted to the millimetre.

Old floor removed

Removal and responsible disposal of your old covering, included in the quote.

You may also be interested in

Our other services.